D. Tippin Water Treatment Facility Master Plan
Tampa, FL
A prioritized capital improvement program to optimize treatment, improve treated water quality, reduce operating cost and stage repair and replacement. The plan identifies improvements accommodating future expansion and alternative water supplies, and includes a facility evaluation and condition assessment of existing structures.
St. Cloud Water Treatment Plant No. 4
St. Cloud, FL
A new water treatment plant including structural design for a high service pump building and MIEX water holding tank. Load-bearing masonry walls, steel bar joist floor and pre-engineered metal stud roof trusses on spread footings, with construction cost estimated at approximately $10,062,000.
Falkenburg Road Water Treatment Facility
Tampa, FL
Construction observation against the permitted contract documents, covering foundation reinforcement and concrete placement, load-bearing CMU wall reinforcement and erection, tie beam reinforcement, structural steel and joist erection, and roof deck placement and fastening.
Tampa Wastewater Digesters
Tampa, FL
Structural engineering for digester facilities within an operating wastewater treatment plant.