Nationwide Capabilities · Florida & Missouri Offices
Structural · Civil · Mechanical · Electrical

Roadway &
Transportation Design

Roadway and highway design, from corridor extensions and widenings to grading, drainage and guardrail upgrades.

MoDOTOn-call qualified
LPALocal agency delivery
FDOTDesign manual experience

MCE delivers roadway and highway design for state DOTs, counties, municipalities and local public agencies, including corridor extensions and widenings, realignments, roundabouts, grading and drainage, and safety upgrades such as guardrail brought to current standards.

Much of this work is federally funded and runs through a local public agency process. That means the design has to satisfy the agency, the DOT and the funding requirements at the same time, and the documentation has to hold up to all three.

Capabilities

  • Roadway and highway design
  • Widening, extension and realignment
  • Grading, drainage and storm sewer
  • Guardrail and safety upgrades to current standards
  • Trails, sidewalks and multi-use paths
  • Local public agency (LPA) project delivery
Request a Proposal

What we design

Roadway extensions and widenings

New alignment and added capacity on existing corridors, including cross-section and profile design.

Realignment and intersections

Corridor realignment and intersection reconstruction, including roundabouts.

Grading and drainage

Roadway grading, storm sewer and conveyance design integrated with the corridor.

Guardrail and safety upgrades

Evaluation and upgrade of existing guardrail and roadside safety hardware to current standards.

Pavement preservation

Resurfacing and preservation projects with associated safety and drainage work.

Trails and sidewalks

Multi-use paths, sidewalk networks and pedestrian connectivity projects.

Permitting and agency coordination

Coordination with DOT districts and review agencies through approval.

Construction phase support

Plan clarification, RFIs and observation during construction.

How a project runs

Roadway projects on public funding follow a defined sequence, and skipping ahead creates rework.

  1. 1

    Scoping and data

    Survey, existing conditions, utility research and confirmation of the funding and review path.

  2. 2

    Concept and alternatives

    Alignment and profile alternatives with enough detail to compare cost and impact.

  3. 3

    Preliminary design

    Typical sections, drainage strategy, right-of-way needs and preliminary quantities.

  4. 4

    Agency review

    Submittal and response through the DOT or local agency review cycles.

  5. 5

    Final plans

    Construction documents, specifications and engineer's estimate.

  6. 6

    Bid and construction support

    Bidding assistance and construction-phase engineering.

Other service lines

Have a roadway project?

Tell us the corridor, the funding source and the schedule, and we will outline an approach.